Flint, MI Police & Fire Training Facility

Public Safety Consultant: Police & Fire Training Campus
Flint, MI Police & Fire Training Facility

PROJECT OVERVIEW

  • LOCATION Flint, MI
  • SERVICES Programming & Design
  • SIZE 19,300 SF
DOWNLOAD PROJECT PDF

project description

 

Size: 19,300 SF

(12,000 SF for Range)

(6,700 SF for Fire Training)

(600 SF for Burn Tower)

Scope: Public Safety Consultant: Programming & Design

Estimated Project Cost: $17,500,000

Study Completion: 2025

Project Duration: 2026-Current

Redstone Team:

Daniel Redstone, FAIA

Teffera Kowalske, AIA

Client Contact: 

Roland N. Aliz, PE

Hubell, Roth, & Clark, Inc. Vice President

[email protected]

(248) 698-1042

Architect of Record: 

Hubell, Roth, & Clark, Inc.

Bloomfield Hills, MI

(248) 454-6300

Redstone Architects was engaged by Hubbell, Roth, & Clark, Inc. (HRC) as its Public Safety specialist to help program and design a police and fire training facility for the City of Flint.

The police training facility includes a large gun range and a MILO room for simulated tactical training.

Fire training buildings includes a fire training center and a burn tower. The burn tower facility will be housed in stacked shipping containers. The existing fire station will be renovated to house fire training.

Conceptual designs were presented to the City in April 2024. Design documents were subsequently developed in 2025. The City of Flint officials broke ground on September 10, 2026.

Flint, MI Police & Fire Training Facility Progress

loading